Category Archives: New Projects

Termotek

Project: Termotek, a leading manufacturer of laser cooling systems, is getting a new energy-efficient building with transparent, clearly structured and light-flooded architecture and working environment. The comprehensive energy concept for this new building will make a big difference in enabling the company to optimize its use of resources in the future. In the new two-level building with around 6,000 square meters, which is triple the company’s current production area, there is a water-water heat pump with heat exchanger, floor collector, and cistern.
Services: Conception design, planning, construction
Location: Baden-Baden (Germany)
Completion: Planned for summer 2019

 

Sanitätshaus Schürmaier

Project: New center of excellence with orthopedic workshop covering an area of 1,800 square meters for retailer in medical supply Schürmaier. The building is barrier-free, allowing persons with mobility issues easy access. A test obstacle course with various types of flooring is set up outside so customers can test wheelchairs and walkers. The new four-level building is designed with a separate offset level and flat roof that is partially green. Balconies and a roof terrace with almost 80 square meters complete the architectural concept.
Services: Conception design, planning, construction
Loacation: Leipzig (Germany)
Completion: Planned for summer 2019

 

Eurofins

Project: An analytics lab covering about 15,900 square meters is being added to supplement the administration center built by Vollack in 2012 for the world leader in laboratory testing Eurofins. This will allow the global market leader to further expand its analysis and service offerings for the pharmaceutical, food, environment, and consumer goods industries. The new building is the fifth project Eurofins is completing with Vollack.
Services: Conception design, planning, construction
Location: Hamburg-Harburg (Germany)
Completion: Planned for mid-2019

Grein

Project: By the summer of 2018, the two previous locations will be combined into a new building for the specialists in punching + laser, textiles and marketing at Grein in Eschwege. 70 employees will be moving into their new modern working environments. The building will offer 1,350 square meters of office space, 3,500 square meters of production and storage space, and 4,300 square meters of landscaped grounds.
Services: Conception design, planning, construction
Location: Eschwege (Germany)
Completion: Planned for summer 2018

CamLine

Project: CamLine, a global provider of products, services, and solutions in high-tech production, will soon be enjoying modern surroundings spanning approximately 1,000 square meters and offering the perfect working environment for software developers and IT specialists. Cooled and ventilated throughout, the technology and design of the building are sure to create a pleasant atmosphere. A recreation area with connected roof terrace also gives employees the space to achieve that all-important balance between concentrated and creative work.
Services: Conception design, planning, construction
Location: Dresden (Germany)
Completion: Planned for the end of 2018

VisionTools

Projedt: New construction of a two-level office building with around 2,500 square meters of space for the over 100 employees of VisionTools, one of the leading system houses for industrial image processing. It will be supplemented with a production hall covering a total of 1,800 square meters of floor space. This new working environment will allow the company to further expand its extensive product range with high-performance and efficient systems for all areas of industrial production technology, supported by the latest in image analysis systems and robotics.
Services: Conception design, planning, construction
Location: Waghäusel (Germany)
Completion: Planned for the end of 2018

East Side Mall

Project: The unique architecture of a new shopping center is rising in one of the most frequented locations in Berlin. Vollack Hallen- und Stahlbau is building the steel structure of the park levels with 760 parking spots and a roof pergola.
Visualizations: FREO Group
Services: Detail statics
Construction
Production
Delivery and assembly of steel structure, profiled sheeting and plain sheet
Fire protection coating F30
Location: Berlin (Germany)
Client: Ed. Züblin AG

ristav CUBE

Project: A new working environment occupying an area of around 2,700 square meters is being created for ristav, specialist for claims management, in order to actively keep step with the structural transformation brought on by digitalization and increased efficiency.  It will be a so-called KfW-Effizienzhaus-55 energy building. The innovative solid wood construction will draw energy from an seasonal latent heat storage and also benefit from a largely self-sufficient building energy system concept. In the core zone, the company will have a “memory” in the form of a two-level “Document Humidor”. The building will have a parking garage in the basement and will be topped off with an offset level with roof terrace for residential use.
Services: Conception design, planning, construction
Location: Karlsruhe (Germany)
Completion: Planned for summer 2018

GfA

Project: New construction of an office and production building with a total of 5,400 square meters of gross surface area and a parking level in the basement for GfA, the market leader for door drives. An assembly hall will also be created as an extension of the existing warehouse. The buildings are connected via a bridge structure. Conceived as a solid construction and set to be certified as a passive building, the office building offers “open space” to 160 employees.
Services: Conception design, planning, construction
Location: Neuss (Germany)
Completion: Planned for spring 2018

ebm-papst

Project: Expansion of the existing production spaces for ebm-papst, the global leader in innovation for fans and motors at its location in Herbolzheim. The new approximately 4,600-square-meter-building encompasses production, logistics, and office spaces and is also designed for the future incorporation of cleanrooms with the necessary technical infrastructure. It is connected with the existing structures via connecting hallways and a connecting structure. Exposed concrete and a white metal sandwich facade provide architectural accents.
Services: Conception design, planning, construction
Location: Herbolzheim (Germany)
Completion: Planned for summer 2018